New construction of a 5-story, 130,000 s.f. self storage facility over parking. This project includes hydrostatic slab and rigid inclusion soil improvements for structural stabilization.
“Kaufman Lynn’s past performance with Pine Crest Preparatory School projects have shown their abilities to provide quality construction, as well as an excellent ability to work within the physical constraints of a school campus to assure parent, faculty and student safety at all times while executing a construction project in an aggressive construction schedule.”
Neyda Otero,
Director of Project Management,
Pine Crest School
130,000 s.f.
Negotiated
Miami, FL
Knickpoint Ventures
FORMGROUP Architecture + Planning
New construction of a 5-story, 130,000 s.f. self storage facility over parking. This project includes hydrostatic slab and rigid inclusion soil improvements for structural stabilization.
3185 South Congress Ave
Delray Beach, FL 33445
PH: 561.361.6700
FX: 561.361.6979
info@kaufmanlynn.com
License No. CGC 021732
All Rights Reserved.